Deskripsi

Key competence:
• Electric power plant turbine hall building;
• Industrial site buildings and constructions;
• Design of electric power plant separate system and assemblies.



Completed Projects.

Magadan TPP:
• Calculations, selection of equipment and preparation of design and estimate documentation on performance of erection works for reconstruction of Unit No. 1,2 BКZ-50-39f IP pressure boiler gas cleaning systems considering their connection to existing operating configuration of working gas ducts and pipelines of Magadan TPP.
Novgorod TPP:
• Preparation of design and working documentation as part of works for reconstruction of 40 АТА steam line (thermal power distribution scheme reconstruction).
Avtozavodskaya TPP:
• Replacement of CHP-3 to CHP-4 communication transfer steam line.